The problem
Single-story home with a covered front porch, surrounded by trees. The old shingle roof had an old chimney stack and a whirlybird vent through it, and some of the fascia boards had rotted.
What we did
The old shingles and underlayment came off down to the deck and loose wood was re-nailed. The chimney stack and the whirlybird came out so the new roof runs clean. High-temperature underlayment went over the entire deck.
Then 26-gauge standing seam panels in Cocoa Brown with brown drip edge, and a metal ridge vent along the ridge with the other vents closed off per code. Three new pipe boots with rain collars and a new boot went in. Rotted fascia was replaced with pressure-treated wood, the soffit screens were replaced, and a 6-inch seamless gutter system in Cocoa Brown went on the whole house.
Before and after


Start to finish
Job photos from our crew, in order.







The result
Finished: October 16, 2026
Underlayment and panels went on October 14. The finished photos, with the new gutters, are from October 16.